Improvements to our buildings at 712 Carroll Street and 181 Lincoln Place continue apace.
If you walk down Carroll Street you will see that the 712 and 716 buildings have now been merged into one and that the new building is accessible through a unified entrance. The construction of the classrooms is complete. Further, we made a number of
improvements at 701 Carroll over the summer:
- The lobby has been enlarged in order to provide ample space for
welcoming students and families as well as for displaying the students'
work.
- Our 1st-4th grades library has been completely
rearranged into four floors. Each floor has a color-coded
library/technology/resource "hub" space. We are calling these rooms
hubs because they are located at the center of each floor and will be
used as places of collaboration for both students and faculty.
- There is a new art room and a new science room, both spaces have new furniture.
The Construction Project
The project at Lincoln Place nears completion. Our entire Middle and High School population enjoys the large, beautiful, and brand new dining room and kitchen along with the beautiful new sunlit hallways and meeting places.
Sterling Place, our newest acquisition, is in the throes of renovation, and we look forward to using the space for special events and performances, as well as for administrative offices.